On a supplier price sheet, "per C" means the price covers 100 units and "per M" means it covers 1,000 units, so the cost of one unit is the quoted price divided by 100 or by 1,000. A box of wire nuts at $18.00 per C costs you $0.18 each, and wire at $950.00 per M costs $0.95 a foot. Enter the per-unit number in your price book, never the per-C or per-M number, or every price built on it will be off by 100x or 1,000x.
What do E, C and M mean on a supplier price sheet?
E, C and M are price units: they tell you how many items the quoted price covers. Electrical, plumbing and HVAC distributors use them because many parts are too cheap to price one at a time. Parspec's quoting documentation lists the standard values as 1 (E) for each, 100 (C) for per hundred, and 1000 (M) for per thousand. The letters come from Roman numerals: C is 100 and M is 1,000.
Wire is the most common place you will see M. Cerrowire's distributor price sheet NC-700 (published July 23, 2026) states that prices shown are per 1,000 feet. Boxed parts often add a fourth unit: the pack, where the price covers a box, case or bag of a stated count.
The table shows how each unit converts to a cost per item. The quoted prices are worked examples, not current market prices.
| Price unit | Quantity the price covers | Example quote (worked example) | Divide by | Cost per unit |
|---|---|---|---|---|
| E (each) | 1 | $4.10 per E | 1 | $4.10 each |
| C (per hundred) | 100 | $18.00 per C | 100 | $0.18 each |
| M (per thousand) | 1,000 | $950.00 per M ft | 1,000 | $0.95 per foot |
| Pack (box, case, bag) | Pack count | $60.00 per box of 25 | 25 | $2.40 each |
| Length (stick, coil) | Length in feet | $42.00 per 10 ft stick | 10 | $4.20 per foot |
How do you convert a per C or per M price to a unit cost?
Use one formula for every line on a supplier sheet: cost per unit = quoted price ÷ quantity the price covers. Then multiply by how many of those units you sell as one price book item.
- Find the price unit. Look for E, C, M, "per box" or a pack count next to the price, or in the column header. A price with no unit next to it is not proof that it is per each; check the header and the sheet notes.
- Divide. $18.00 per C ÷ 100 = $0.18. $950.00 per M ÷ 1,000 = $0.95. $60.00 per box of 25 ÷ 25 = $2.40.
- Match the unit you sell. If you sell wire by the foot, $0.95 is your cost. If your price book item is a 25 ft pull of wire, the cost is 25 × $0.95 = $23.75.
- Write the unit down. Record "each", "ft" or "box" with the item, so the next person updating it from a new price sheet knows which number to enter.
Freight, fuel surcharges and other costs to get the part to your shop are a separate step. This guide to adjusting prices when material costs rise covers landed cost and how to carry a supplier increase through to your selling prices.
What happens to your prices if a unit conversion is wrong?
A unit error is never a small error. It is off by exactly 10x, 25x, 100x or 1,000x, and if your markups depend on cost, it can also push the item into the wrong markup band.
The worked example below uses a cost-band markup schedule: 250% markup on parts costing under $10, 150% from $10 to $49.99, 70% from $50 to $249.99 and 35% at $250 and up. (This post on material markup by cost band explains why cheap parts carry higher markups.) Each row compares the correct entry with a common mistake.
| Item and supplier quote (worked example) | Correct unit cost | Correct price | Mistake | Wrong cost | Wrong price | Price error |
|---|---|---|---|---|---|---|
| Wire nuts, $18.00 per C | $0.18 | $0.63 | Box price entered as each | $18.00 | $45.00 | 71x too high |
| Conduit straps, $24.00 per C | $0.24 | $0.84 | Divided by 1,000 instead of 100 | $0.024 | $0.08 | 90% too low |
| Fittings, $60.00 per box of 25 | $2.40 | $8.40 | Box price entered as each | $60.00 | $102.00 | 12x too high |
| 12/2 NM-B wire, $950.00 per M ft | $0.95/ft | $3.33/ft | Divided by 100 instead of 1,000 | $9.50/ft | $33.25/ft | 10x too high |
| 3/4" copper, $42.00 per 10 ft stick | $4.20/ft | $14.70/ft | Stick price entered per foot | $42.00/ft | $105.00/ft | 7x too high |
The prices that are too high usually get caught quickly, because a customer or a technician questions a $45 wire nut. The prices that are too low are the dangerous ones. Nobody complains when conduit straps cost 8 cents, so a price that is 90% too low can sit in a price book for years.
The fittings and copper rows show the band effect. Entering the box price moved the fittings from the 250% band to the 70% band, so the wrong price is 12x too high rather than 25x. When a unit mistake changes the band, the error stops being a clean multiple, and the item is harder to spot when you scan the list. Use the margin and markup calculator to check any single line by hand.
How do unit conversion errors hide inside flat-rate tasks?
A flat-rate task bundles parts and labor into one price, so a unit error in one material is multiplied by the quantity that task uses. A task that uses 50 ft of 12/2 wire carries $47.50 of wire at the correct $0.95 a foot. If the wire was entered at $9.50 a foot, the same task carries $475.00 of wire, and every price built from that cost is wrong.
The error also spreads. If ten tasks use the same wire, one bad cost entry produces ten wrong task prices. That is why it pays to fix the cost on the material line once and let the tasks recalculate, rather than adjusting each task price by hand. This comparison of flat-rate and time-and-materials pricing covers how flat-rate tasks are built from material and labor.
How do you check a price book for unit of measure mistakes?
Unit mistakes leave a pattern you can search for. Five checks catch most of them:
- Look for exact multiples. After a supplier update, compare each new cost with the old one. A change of exactly 10x, 25x, 100x or 1,000x, or 0.1x, 0.04x, 0.01x or 0.001x, is almost always a unit problem, not a price increase.
- Sort similar items by cost. Put all wire connectors, straps or fittings side by side. One that costs 100 times more or less than its neighbors is suspect.
- Check against an invoice. Take a recent invoice line, divide the extended amount by the quantity shipped in your selling unit, and compare that with the price book cost.
- Look for tiny prices. Any part priced under $0.25 should be one you sell in bulk, by the foot, or as part of a task. If not, check the unit.
- Record the unit with every item. A unit field that says "each", "ft" or "box of 25" tells the next person exactly which number the cost should be.
Run these checks every time you load a new supplier sheet, not only during a scheduled review. This price book audit guide covers the full set of checks and how often to run them.
If you keep your catalog in Pricebookr, each item has a Unit field (for example each, ft or hr), and the CSV import reads an optional unit column that defaults to each. A bulk cost edit shows a preview before anything is saved, so a cost that jumps by exactly 100x can be caught before it reaches a price. Prices set by hand stay fixed when the cost changes, so after fixing a unit mistake, check any manual prices that were set from the wrong cost.
Do field service tools convert supplier units for you?
Some do, mostly inside their inventory features rather than in the price book itself. ServiceTitan's inventory module lets you add an alternative unit of measure to a material, with a quantity, a vendor and a unit cost for that purchasing unit (help article updated October 15, 2026). Jobber's Products & Services list stores one unit cost and one unit price per item (updated October 29, 2026), so the conversion from a supplier's per C or per M price happens before you enter the cost.
Either way, someone has to read the price unit on the supplier sheet correctly at least once. Treat the unit as part of the item, not as a note on an old invoice.
FAQ
What does "per M" mean on a wire price?
"Per M" means the price is for 1,000 units, which for wire means 1,000 feet. To get the cost per foot, divide the quoted price by 1,000. Wire quoted at $950.00 per M costs $0.95 a foot, and a 250 ft coil at that price costs $237.50. Wire manufacturers' distributor price sheets commonly state prices per 1,000 feet.
What does "per C" mean on a supplier invoice?
"Per C" means the price covers 100 units. C is the Roman numeral for 100. Divide the quoted price by 100 to get the cost of one unit, so connectors at $18.00 per C cost $0.18 each. If the invoice quantity is 300 at $18.00 per C, the extended amount should be $54.00, not $5,400.
Should my price book cost be per each or per box?
Your price book cost should be in the same unit you sell. If you charge for fittings one at a time, enter the cost per fitting, which is the box price divided by the box count. Enter a box cost only when the price book item is the whole box. Record the unit with the item so later updates use the same basis.
How do I price wire that I sell by the foot?
Convert the supplier price to a cost per foot, then apply your markup or margin. Wire at $950.00 per M costs $0.95 a foot. At a 250% markup the selling price is $3.33 a foot. For a flat-rate task, multiply the cost per foot by the footage the task uses, so 50 ft adds $47.50 of material cost.